Fields of Activities
Design, Construction, Installation, Maintenance and Consultation Services on:
1. Water Supply and Sanitation Systems,
2. Drilling of Bored Piles, (Win Piling Group)
3. Plumbing Works,
4. Testing of Water and Wastewater, (ISO TECH LABORATORY)
5. Testing of Concrete Compressive Strength, Steel Tensile Strength (ISO TECH LABORATORY)
The WEG was placed 45th in position out of the 100 top tax- paying companies in Myanmar for the 2011-2012 fiscal year.
Selected Previous
Water Supply and Sanitation Design Projects
Design, Installation and Consultation Service.
Some of Previous Water Supply and Sanitation Design Projects.
- Gems Garden Condominiums (21 Storeyed Building 4 Nos.), No.(113), Yangon-Insein Road, Hlaing Township
- 20 Storeyed R.C.C Building with 3 Basement, No.(238), East Race Course Road
- 18 Storeyed R.C.C Building with Basement, 49th Street, Botahtaung Township
- Redevelopment Housing Project, 50th& 51st Street, Mahabandoola Road & Merchant Road
- 15-1/2 Storey with 2 Basement R.C.C Building, Shwegondine Road, Bahan Township
- Inya Lake Residence (26 Storey with 2 Basement), No.30, Pyay Road, Mayangone Township
- M Tower (26 Storey SC Building with 3 Basement), No.527, Pyay Road, Kamaryut Township
- The Ivy Condominium (22 Storey with Basement), No.120, Pyay Road, Mayangone Township
- 20 Storey with 3 Basement R.C.C Building, No. (51/A), Sayasan Road, Bahan Township
- Sedona Hotel Extension (30 Storeyed R.C.C Building), Kabar Aye Pagoda Road
- Illustra (31 Storeyed R.C.C Building), PhoeSein Road
- Myanmar Yangon Hotel, Sin Phyu Shin Yeiktha, Hlaing Township
- Time City Project, Hantherwaddy Road, Kamaryut Township
- Spring Line Project (26 Storey Condo-4 Nos. & 17 Storey Office & Hotel), Hlaing River Road, Insein Township
- Pyay Tower & Residence, Pyay Road, Mayangone Township
- Polo Club Residence, East Race Course Road, Tamwe Township
- Prince Tower (4 Basements + 24 Storey + Penthouse R.C.C Building), Min Ye KyawSwar Road, Ahlone Township.
Selected Current Water Supply and Sanitation Design Projects
Transmission Line Installation
Transmission Pipe Installation, Special Development Project Naypyitaw
- Project Description
- From Chaungmagyi Dam to Slow Sand Filter
- Key Project Data
- M.S Pipe, R.C.C Pipe
- Pipe Length = M.S (220) Rft , R.C.C (9060) Rft
- Pipe Size = 24ӯ
- Supply System = Gravity System
Treatment System for Town Water Supply
Client - Special Development Project (SDP)
Key Project Data
- Slow Sand Filtration Rate = 2.5 MGD
- Plant Area = 45’ x 76’ x 8 Unit = 360’ x 76’
- Filter Media Sand = 3 ftdept
- Effective Size = 0.35 mm
Storage Reservoir for Town Water Supply
Client - Special Development Project (SDP)
- Project Description
- Location (Nan Oo)
- Key Project Data
- R.C.C Walling, R.C.C Footing, R.C.C Slab
- Tank Size = 80’ x 40’ x 12
Distribution System for Town Water Supply
Client - Special Development Project (SDP)
Period - 3 /2010 - /2013
Project Description
- Sources of Water = ThayatchinChaung Dam,
BonekweChaung Dam
- From ThayatshinChaung Dam to Gal (100000) G.T,
From Gal (100000) G.T to Pobbathiri Township
Key Project Data
- uP.V.C Pipe (13.5)Class
- Pipe Size = 1½"Ø, 2"Ø, 3"Ø, 4”Ø, 6"Ø, 8”Ø,10”Ø, 12”Ø and 16”Ø
- Supply System = Gravity System
Pump House, Pump Installation and Pumping Water Line, Design and Installation
Appropriate Technology for Rural Areas Drinking Water Treatment System
Small Scale Slow Sand Filtration Systems for Drinking Purpose in the following locations:
1. Kawdwon Village, Kwongyangone Township
2. Tawkasaw Village, Kwongyangone Township
3. Myittar Village, Kwongyangone Township
4. Tawkalaik Village, Kwongyangone Township
5. Thaungkhon Village, Kwongyangone Township
6. Tawkay Village, Kwongyangone Township
7. Maeyakone Village, Kwongyangone Township
8. Dayallu Village, Kwongyangone Township
9. Myaungdagar B.E.H.S, Hmawbi Township
10. Dhamawihara Monastery, Larkapon Village, Twantay Township